240z BMW V10 Engine Final Installation, Brakes, Air Suspension, Steering, Cooling are ALL DONE!

In todays episode were getting the engine back in the car, getting the brakes finished off, running air lines for the airbags, running fuel lines and all sorts of other final assembly!
Huge Thanks to Canyon Sport Wraps for help with this build, if you wanna get your car wrapped check them out here: http://canyonsportwraps.com

❱ Shop – http://bisforbuild.com/
❱ Game – http://disfordrift.com
❱ Patreon – http://www.patreon.com/user?u=3364742
❱ Facebook – http://facebook.com/bisforbuild
❱ Instagram – http://instagram.com/bisforbuild
❱ Twitch – https://www.twitch.tv/bisforbuild

Music:
Fareoh – Cloud Ten

Author: phillynews215

HOSTING BY PHILLYFINESTSERVERSTAT | ANGELHOUSE © 2009 - 2024 | ALL YOUTUBE VIDEOS IS A REGISTERED TRADEMARK OF GOOGLE INC. THE YOUTUBE CHANNELS AND BLOG FEEDS IS MANAGED BY THERE RIGHTFUL OWNERS. POST QUESTION OR INQUIRIES SEND ME AN EMAIL TO PHILLYNEWSNOW215@GMAIL.COM (www.phillynewsnow.com)

38 thoughts on “240z BMW V10 Engine Final Installation, Brakes, Air Suspension, Steering, Cooling are ALL DONE!

  1. Wow! The car is looking awesome! Was starting to think B was for body work lol. Your attention to detail is really paying off and I think its definitely starting to show in this video. Nice work!

Comments are closed.